| RIDF G.ANNEXURES | 3.18 MB |  |
| Application form for STW under RIDF | 1.41 MB |  |
| RIDF G.ESTIMATES | 3.52 MB |  |
| Operational guideline of RIDF.pdf | 3.71 MB |  |
| Application form for STW under RIDF.pdf | 1009.89 KB |  |
| RIDF Loan Sanction - Installation of 61,100 STW.pdf | 3.41 MB |  |
| RIDF Loan Sanction -Installation of 38,900 STW.pdf | 3 MB |  |
| RIDF Loan Sanction - Installation of 1000 solar PV powered STW.pdf | 2.67 MB |  |
| RIDF Loan Sanction - Soil testing, Quality control and Input testing laboratories.pdf | 2.33 MB |  |
| RIDF Loan Sanction - Revalidation.pdf | 614.59 KB |  |
| NGO appointment list.pdf | 335.03 KB |  |
| List of Arsenic & Fluoride affected area.pdf | 1.01 MB |  |
| EOI for Empanelment of Contractor for Installtion of STW and construction of Water Storage Tank under RIDF | 1.5 MB |  |
| Terms of Reference (TOR) for engagement of Contractual Employee for Projects under RIDF | 2.35 MB |  |
| RIDF Guidelines - I | 2.78 MB |  |
| RIDF Guidelines -III | 1.98 MB |  |
| Minutes Tender Committee_ 15.11.2018 | 604.86 KB |  |
| Admissible subsidy | 2.27 MB |  |
| TOR for Engagement of District level NGO under RIDF, NABARD | 2.85 MB |  |
| EOI for Empanelment for installation of STW and construction of Water Storage Tank | 4.02 MB |  |
| Notice Inviting application for engagement of contractual employee under RIDF | 3.53 MB |  |
| Corrigendum _EOI for Empanelment for installation of STW and construction of Water Storage Tank | 203.5 KB |  |
| Interview for engagement of Contractual Employee in Directorate of Agriculture, Assam under RIDF | 2.09 MB |  |